# HAS GENERADO 960 CLASES DIFERENTES. ?>
| The Beginning of the End | |||
| Posted by: Jordi on Tuesday, February 01, 2011 - 11:16 PM | |||
![]() |
As predicted, IANA has allocated two /8 IPv4 blocks to APNIC. That brings the remaining IANA pool down to five, which triggers a plan to evenly allocate the remaining five /8s to the five RIRs. With the possible exception of AfriNIC and LACNIC, the RIRs will be done in 6 months or so. Depletion at the LIR level will happen case-by-case, depending on how clever, how conservative, and how well-stocked the LIR is. | ||
| Complete info at NetworkWorld. | |||